2. | Jan Einar Gravdal, H.B. Siahaan and Knut Steinar Bjørkevoll, “Limiting Factors for the Ability to Achieve Accurate Pressure Control in Long Wells”, 2018-2-6 |
| |
1. | Jing Zhou, Jan Einar Gravdal, Per Strand and Svein Hovland, “Automated Kick Control Procedure for an Influx in Managed Pressure Drilling Operations”, 2016-1-3 |
| [1] Idris Sule, Syed Imtiaz, Faisal Khan and Stephen Butt (2018), doi:10.1016/j.petrol.2018.11.046 |
[2] Fang, Meng, Wei, Xu and Li (2019), doi:10.3390/en12203930 |
[3] Andreas K. Fjetland, Jing Zhou, Darshana Abeyrathna and Jan Einar Gravdal (2019), doi:10.1109/ICIEA.2019.8833850 |
[4] Haibo Liang, Gang Liu, Jialing Zou, Jing Bai and Yingjun Jiang (2021), doi:10.1016/j.future.2021.05.011 |
[5] Muhammad Usama, Jie Cao, Jan Einar Gravdal and Dan Sui (2023), doi:10.23919/CCC58697.2023.10239724 |
|